With the hospital’s motto ‘Your Health is Our Main Concern - You are in the Best of Hands’ in mind, FlowCon is proud to contribute…
The Hospital Real San José ‘Valle Real’ is an institution that offers an innovative concept of hospital services combined with relatives’ hotel. Given its structure and design, it is conceived as an intelligent hospital that offers patients, doctors and other hospital staff cutting-edge science and technology, high quality services, modern facilities and optimal indoor climate. Thanks to this and specialized modern medicine, it is possible to offer more and more timely diagnosis, less invasive surgery and a shorter recovery time.
Decision Parameters
Reliability: The hospital is split over two locations with a 10-year old facility in the metropolitan area and this new facility being built in the
Zapopan area. With more than 10 years of trouble-free operation with FlowCon EVS in the old facility, it was an easy decision to maintain with the brand and FlowCon is again the sole provider of PICV valves to this new project.
Energy Efficiency: The new project has high demands to energy efficiency and modern solutions. It is equipped with variable speed pumps along with modulating pressure independent control valves (PICVs) and simple pressure independent temperature control valves, which are ideal for this type of project.
Performance: The FlowCon EVS valves installed and still running in the old hospital have more than 10 years of work behind them. With the
pre-set solution, robust design and an accuracy of ±5% the FlowCon valves have been a success with a proven long life. In addition to FlowCon EVS, the new facility will also include true PICVs in form of FlowCon Green and FlowCon SM.
Above three decision parameters - as well as several other successful local FlowCon projects - is why FlowCon was chosen for this project.
Project Configurations
Project Name: | Hospital Real San José Valle Real |
Owner: | San José Group |
Architect: | Burboa Group |
Consultant: | Grupar Burboa |
Contractor: | Element Vento S.A. de C.V. |
Building Configuration: | 232 hospital rooms + operating rooms, intermediate therapy, neonatal therapy and reception offices |
Valve Model and Quantity: | 517 valve split over FlowCon EVS and FlowCon Green.2 (FCUs) + FlowCon Green.3 and FlowCon SM (AHUs) |
Application: | New building |
FlowCon Distributor: | Sistemas Hidronicos del Norte |
Date of Inauguration: | December 16th, 2019 |
FlowCon 最新项目案例
显示所有项目
New office for Yandex, Armenia
IT specialists gathered under one roof and FlowCon helps to provide optimal working environment with FlowCon Green PICVs
Expansion of Medial Center in Yerevan, Armenia
Vardanants offers high-quality medical services for all
Umm al Seneem Park, Doha, Qatar
New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…
Netflix Film and Series production on new Sound Stages in New Mexico, USA
The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…
Upgraded HVAC system at the Radisson Blu Hotel, Yerevan, Armenia
From static to dynamic balancing – from internal to external adjustability – easy exchange with FlowCon ABVs
World’s largest Duty-Free Mall on Hainan Island, China
800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves