05.2015

FlowCon PICV - Chilled Beams,
Heater Batteries and FCUs

The New South Glasgow Hospital (NSGH) project will result in new state-of-the-art healthcare facilities and high quality design environments and be one of the most advanced medical facilities in Europe. The project being the biggest ever hospital building project undertaken in Scotland and currently the greatest hospital building project in Western Europe, will cost in excess of £840 million in total.

On completion it will comprise a new acute care hospital in 14-floors with 1.109 beds in single-room accommodation, 5-storey 256-beds children’s hospital and 30 modern operating theatres. In additional to the main hospital, the Laboratory Medicine comprises a 25.000m2 centralized medical laboratories to provide medical laboratory space to support blood sciences, medical genetics, medical pathology, micro-biology, 300 body mortuary and other services for the main hospital.

This major healthcare building comprises of 3 primary accommodation units that are distributed around a central secure service yard linked to facilities management and the national distribution. All bedrooms will be light and airy with large window offering views to the outside world. The bedrooms will provide a therapeutic and healing patient environment that is safe, clean, private, quiet and comfortable.

Project Configurations

Project Name: New South Glasgow Hospital
Location: Glasgow, Scotland, United Kingdom
Type af Building: Hospital and Laboratory
Configuration of Building: FlowCon Green (single valves and valve assemblies)
Construction Time: February 2010 - March 2012 (laboratory), Q1 2011 - Q4 2014 (hospital)
Opening: July 2015
Client: NHS Greater Glasgow & Clyde
Architect: Nightingale Associates
Consultant: Zisman Bowyer & Partners
Main Contractors: Brookfield Multiplex
Contractor: Mercury Engineering
Customer Technical support: Advanced Technical Products Ltd
FlowCon Distributor, Ireland: Advanced Technical Products Ltd

FlowCon PICV valves were chosen in order to help secure optimal indoor comfort for both hospital staff, patients and visitors and at the same time reduce energy use and thereby cost. In additional, complete assemblies were chosen where possible in order to reduce site work. To help workflow efficiency in the project, assemblies were supplied first, followed by actuators and lastly inserts when needed at site.

In 2012, World Architecture Festival Awards (WAF), recognizing the best in architecture and design from around the world, nominated the NSGH project in category “Future Projects - health category” for its fantastic and innovative design – a positive indication everybody can be proud of…


FlowCon 最新项目案例

显示所有项目

Cooling - Air handling units - FlowCon Green - FlowCon SM

New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…

Cooling - Heating - FlowCon E-JUST - Griswold Quickset

The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…

Cooling - Air handling units - Pre-Cool Air Handling Units - Fan Coil Units - FlowCon Green - FlowCon SM

800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves

FlowCon Project at Cactus Towers Copenhagen Denmark
Heating - Radiators - Underfloor Heating - FlowCon GreEQ - FlowCon SDP

"Micro-living" youth housing in the heart of Copenhagen. Efficient and sustainable - this goes for building design and the choice of FlowCon valves

FlowCon Project at High Garden Bagneux
Heating - Fan Coil Units - Radiators - FlowCon ADP - FlowCon EDP - FlowCon Green - France

The new complex will include 250 apartments and a French-style convenience store – with FlowCon PICV and DPCV

FlowCon Project at Oval Village London outside
Heating - Cooling - Fan Coil Units - FlowCon By-Pass Mini - FlowCon Green - FlowCon GreEQ - London - United Kingdom

Modern homes with focus on indoor climate and reduced energy consumption – installed with FCU bypass units including FlowCon PICVs