New infrastructural hub in the heart of Siberia will provide easy access to the Tyumen region and for the local businesses and population easy access to the world.
The new Tobolsk Airport, located 30 km south of Tobolsk city, opened end of September 2021 and regular air trafic started mid October same year. During fall of 2020 runways, taxiways and navigation, lighting and meteorological systems were completed and now the 5000 m2 terminal building and other administration and service buildings are ready. The inauguration of Tobolsk Airport will without doubt increase the tourist and investment attractiveness of the city, benefit the regional businesses, and improve the quality of life of the population of both city and region.
Considering the world trend of aviation traffic increase, the terminal design includes the possibility for further extension. The current layout is designed to handle 1.3 mill. passengers per year. So even though it is a small airport, it ensures great opportunities for future city development. It will also close a demand gap as the closest airport before Tobolsk Airport is more than 250 km away.
Application
FlowCon has supplied all valves for the radiator system incl. differential pressure control valves, zone valves and measuring points. This will help optimize indoor temperature benefiting both air travelers and airport employees. At the same time heating energy is maintained at a minimum and the risk of noise from surplus pressure in the radiator thermostats is eliminated - 9 months of the year will have average day temperature below 10°C so proper control of the heating system is essential. This is in all ways a project to be environmentally proud of - as we say at FlowCon: Your Environment is Our Commitment.
Project Configurations
Project name: | Tobolsk Airport |
Project development: | SIBUR and the Tyumen Region Government |
Contractor: | Ronesans Heavy Industry |
Valve model and quantity: |
Dynamic balancing: FlowCon E-JUST and FlowCon Wafer Pressure control: FlowCon EDP with FlowCon QuickDisc® Static balancing: FlowCon S-JUST Totaling 350 valves |
Application: | New building |
FlowCon distributor: | Yakrus |
Date of inauguration: | Q3.2021 |
FlowCon 最新项目案例
显示所有项目
Umm al Seneem Park, Doha, Qatar
New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…
Netflix Film and Series production on new Sound Stages in New Mexico, USA
The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…
World’s largest Duty-Free Mall on Hainan Island, China
800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves
Cactus Towers, Copenhagen, Denmark
"Micro-living" youth housing in the heart of Copenhagen. Efficient and sustainable - this goes for building design and the choice of FlowCon valves
High Garden in Parisian suburb’s eco-district, France
The new complex will include 250 apartments and a French-style convenience store – with FlowCon PICV and DPCV
Oval Village, London – Phoenix Court is the first new apartment block
Modern homes with focus on indoor climate and reduced energy consumption – installed with FCU bypass units including FlowCon PICVs