The CMA tower is the crown jewel of the King Abdullah Financial District (KAFD), Riyadh and the tallest building in the capital.
Rising 385 meters above the surrounding city, the CMA Tower is the centerpiece of the financial plaza of the King Abdullah Financial District - the world’s largest green building development. The iconic 80-story crystalline office tower symbolizes the beginning of a new era of global financial leadership within the Saudi capital. The tenants are central market authorities, stock of exchange, major banks and international rating companies.
The design solution of this intelligent, functional, and sustainable building is a subtle blend of conventional and well understood techniques combined with international best practice and cutting-edge technologies, merged with local expertise of construction techniques and methods for dealing with the harsh natural environment. The building is a class-A office skyscraper with anticipated LEED Gold certification. FlowCon is proud to be part of this.
Project Configurations
Developer: | Al Ra’idah Investment Company |
Architect: | HOK / Omrania joint-venture |
Consultant: | Omrania |
Contractor: | Advanced Vision |
Project Name: | CMA Tower, Riyadh |
Configuration of Building: | 181 FCUs, 265 AHUs and 17 Critical Cooling |
Number of Valves: | 500 valves |
Valve Model: | FlowCon SM and FlowCon Wafers |
Configuration: | By-Pass assemblies w. PICVs, automatic balancing valves and PICVs |
Types of Application: | New building |
Date of Inauguration: | October 2018 |
Application
FlowCon was the sole supplier of PICVs to the project securing maintained target ΔT and reduced commissioning time. Due to FlowCon’s dynamic and pressure independent solution no overflow through the PICVs, even at partial loads, were guaranteed and the LEED Gold status obtainable. Consult FlowCon to understand how FlowCon PICVs can contribute to green building certification.
Building Description
Height: | 385 meters (80 floors) |
Size: | 182.000 m² |
Energy credentials: | LEED Gold |
Cooling capacity: |
Number of FCUs: 181 Number of AHUs: 265 Number of CRACs: 17 (Computer Room Air Condition) 3.500 tons of refrigeration. |
FlowCon 最新项目案例
显示所有项目
New office for Yandex, Armenia
IT specialists gathered under one roof and FlowCon helps to provide optimal working environment with FlowCon Green PICVs
Expansion of Medial Center in Yerevan, Armenia
Vardanants offers high-quality medical services for all
Umm al Seneem Park, Doha, Qatar
New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…
Netflix Film and Series production on new Sound Stages in New Mexico, USA
The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…
Upgraded HVAC system at the Radisson Blu Hotel, Yerevan, Armenia
From static to dynamic balancing – from internal to external adjustability – easy exchange with FlowCon ABVs
World’s largest Duty-Free Mall on Hainan Island, China
800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves