01.2019

CMA Tower, Capital Market Authority HQ
- Riyadh, Saudi Arabia

The CMA tower is the crown jewel of the King Abdullah Financial District (KAFD), Riyadh and the tallest building in the capital.

Rising 385 meters above the surrounding city, the CMA Tower is the centerpiece of the financial plaza of the King Abdullah Financial District - the world’s largest green building development. The iconic 80-story crystalline office tower symbolizes the beginning of a new era of global financial leadership within the Saudi capital. The tenants are central market authorities, stock of exchange, major banks and international rating companies.

The design solution of this intelligent, functional, and sustainable building is a subtle blend of conventional and well understood techniques combined with international best practice and cutting-edge technologies, merged with local expertise of construction techniques and methods for dealing with the harsh natural environment. The building is a class-A office skyscraper with anticipated LEED Gold certification. FlowCon is proud to be part of this.

Project Configurations

Developer: Al Ra’idah Investment Company
Architect: HOK / Omrania joint-venture
Consultant: Omrania
Contractor: Advanced Vision
Project Name: CMA Tower, Riyadh
Configuration of Building: 181 FCUs, 265 AHUs and 17 Critical Cooling
Number of Valves: 500 valves
Valve Model: FlowCon SM and FlowCon Wafers
Configuration: By-Pass assemblies w. PICVs, automatic balancing valves and PICVs
Types of Application: New building
Date of Inauguration: October 2018

Application

FlowCon was the sole supplier of PICVs to the project securing maintained target ΔT and reduced commissioning time. Due to FlowCon’s dynamic and pressure independent solution no overflow through the PICVs, even at partial loads, were guaranteed and the LEED Gold status obtainable. Consult FlowCon to understand how FlowCon PICVs can contribute to green building certification.

Building Description

Height: 385 meters (80 floors)
Size: 182.000 m²
Energy credentials: LEED Gold
Cooling capacity: Number of FCUs: 181
Number of AHUs: 265
Number of CRACs: 17
(Computer Room Air Condition)
3.500 tons of refrigeration.

More Information


Latest FlowCon Projects

See all projects

Cooling - Air handling units - FlowCon Green - FlowCon SM

New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…

Cooling - Heating - FlowCon E-JUST - Griswold Quickset

The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…

Cooling - Air handling units - Pre-Cool Air Handling Units - Fan Coil Units - FlowCon Green - FlowCon SM

800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves

FlowCon Project at Cactus Towers Copenhagen Denmark
Heating - Radiators - Underfloor Heating - FlowCon GreEQ - FlowCon SDP

"Micro-living" youth housing in the heart of Copenhagen. Efficient and sustainable - this goes for building design and the choice of FlowCon valves

FlowCon Project at High Garden Bagneux
Heating - Fan Coil Units - Radiators - FlowCon ADP - FlowCon EDP - FlowCon Green - France

The new complex will include 250 apartments and a French-style convenience store – with FlowCon PICV and DPCV

FlowCon Project at Oval Village London outside
Heating - Cooling - Fan Coil Units - FlowCon By-Pass Mini - FlowCon Green - FlowCon GreEQ - London - United Kingdom

Modern homes with focus on indoor climate and reduced energy consumption – installed with FCU bypass units including FlowCon PICVs