18.2019

Miesian Plaza, Dublin, Ireland

Miesian Plaza - three distinctive buildings on one iconic address - is the first building complex in Ireland to achieve LEED Platinum v4 Certification.

#MiesianPlaza #LEED #FlowCon. 

The Miesian Plaza, a complex of three office buildings, was originally designed as a high-end office complex and was constructed in two phases during the 1960s and 1970s. The three buildings include a 4- and a 5-story building in the front and in the back 8-stories raised on a podium; in total 21.800 m2 which today - after major refurbishment - houses the new headquarters for the Departments of Health and Children and Youth Affairs in a modern facility hosting more than 800 employees.

In 2016 the refurbishment was started to upgrade to ultra-modern buildings with Grade A office accommodation, which would be energy efficient and have the highest sustainability credentials. The project is on target to achieve WELL Building Standard Compliance and the design has just been granted LEED v4 Platinum Rating.

Project Configurations

Project Name: Miesian Plaza
Client: Remley Developments Ltd
Architect: Scott Tallon Walker Architects
Consultant: ARUP Consultant Engineers
Contractor: Designer Group
Configuration: By-Pass assemblies with PICVs on all FCUs
Valve Model: 4 union FlowCon By-Pass Assemblies with FlowCon Green and modulating actuator
Application: Redevelopment
FlowCon Distributor: ATP Ireland
Date of Completion: 2017

The sustainability engineering design team incorporated a number of high-efficiency energy saving features, including high efficiency lighting fixtures, a high-performance envelope upgrade, high efficiency chillers and boilers, combined heat and power production as well as ice thermal storage. A responsive BMS system tracks the sun and responds accordingly - motorized internal blinds control solar gain and glare which together with FlowCon PICVs on each FCU provide maximum occupant comfort. With the FlowCon Green PICV inserts easy selection, setting and installation are achieved as well as dynamic balancing with full authority. With the FlowCon By-Pass assemblies and insert solution, commissioning of the system and maintenance of the FCUs becomes a breeze - FlowCon is proud to be part of this prestigious project. 

 

More Infomation


Latest FlowCon Projects

See all projects

Cooling - Heating - FlowCon E-JUST - Griswold Quickset

The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…

Cooling - Air handling units - Pre-Cool Air Handling Units - Fan Coil Units - FlowCon Green - FlowCon SM

800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves

FlowCon Project at Cactus Towers Copenhagen Denmark
Heating - Radiators - Underfloor Heating - FlowCon GreEQ - FlowCon SDP

"Micro-living" youth housing in the heart of Copenhagen. Efficient and sustainable - this goes for building design and the choice of FlowCon valves

FlowCon Project at High Garden Bagneux
Heating - Fan Coil Units - Radiators - FlowCon ADP - FlowCon EDP - FlowCon Green - France

The new complex will include 250 apartments and a French-style convenience store – with FlowCon PICV and DPCV

FlowCon Project at Oval Village London outside
Heating - Cooling - Fan Coil Units - FlowCon By-Pass Mini - FlowCon Green - FlowCon GreEQ - London - United Kingdom

Modern homes with focus on indoor climate and reduced energy consumption – installed with FCU bypass units including FlowCon PICVs

FlowCon Project at Sarthe Cancer Center in France
Heating - Cooling - Fan Coil Units - FlowCon Green

Center of Excellence combining expertise, innovation, comfort, and humanity – in the fight against cancer. And FlowCon PICVs are used to provide…