Miesian Plaza - three distinctive buildings on one iconic address - is the first building complex in Ireland to achieve LEED Platinum v4 Certification.
#MiesianPlaza #LEED #FlowCon.
The Miesian Plaza, a complex of three office buildings, was originally designed as a high-end office complex and was constructed in two phases during the 1960s and 1970s. The three buildings include a 4- and a 5-story building in the front and in the back 8-stories raised on a podium; in total 21.800 m2 which today - after major refurbishment - houses the new headquarters for the Departments of Health and Children and Youth Affairs in a modern facility hosting more than 800 employees.
In 2016 the refurbishment was started to upgrade to ultra-modern buildings with Grade A office accommodation, which would be energy efficient and have the highest sustainability credentials. The project is on target to achieve WELL Building Standard Compliance and the design has just been granted LEED v4 Platinum Rating.
Project Configurations
Project Name: | Miesian Plaza |
Client: | Remley Developments Ltd |
Architect: | Scott Tallon Walker Architects |
Consultant: | ARUP Consultant Engineers |
Contractor: | Designer Group |
Configuration: | By-Pass assemblies with PICVs on all FCUs |
Valve Model: | 4 union FlowCon By-Pass Assemblies with FlowCon Green and modulating actuator |
Application: | Redevelopment |
FlowCon Distributor: | ATP Ireland |
Date of Completion: | 2017 |
The sustainability engineering design team incorporated a number of high-efficiency energy saving features, including high efficiency lighting fixtures, a high-performance envelope upgrade, high efficiency chillers and boilers, combined heat and power production as well as ice thermal storage. A responsive BMS system tracks the sun and responds accordingly - motorized internal blinds control solar gain and glare which together with FlowCon PICVs on each FCU provide maximum occupant comfort. With the FlowCon Green PICV inserts easy selection, setting and installation are achieved as well as dynamic balancing with full authority. With the FlowCon By-Pass assemblies and insert solution, commissioning of the system and maintenance of the FCUs becomes a breeze - FlowCon is proud to be part of this prestigious project.
More Infomation
Latest FlowCon Projects
See all projects
Umm al Seneem Park, Doha, Qatar
New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…
Netflix Film and Series production on new Sound Stages in New Mexico, USA
The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…
World’s largest Duty-Free Mall on Hainan Island, China
800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves
Cactus Towers, Copenhagen, Denmark
"Micro-living" youth housing in the heart of Copenhagen. Efficient and sustainable - this goes for building design and the choice of FlowCon valves
High Garden in Parisian suburb’s eco-district, France
The new complex will include 250 apartments and a French-style convenience store – with FlowCon PICV and DPCV
Oval Village, London – Phoenix Court is the first new apartment block
Modern homes with focus on indoor climate and reduced energy consumption – installed with FCU bypass units including FlowCon PICVs