Located in the Olympic Green in Beijing, the $423 Million Olympic stadium is the world’s largest steel structure. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003, after a bidding process that included 13 final submissions.

Multiple requirements, including the ability for post-Olympics use, a retractable roof and low maintenance costs were required for the optimum design.

The removal of the retractable roof, which was done due to security issues, made the building look lighter. Due to the stadium’s appearance, it was nicknamed “The Bird’s Nest”. Temperature and airflow of every surface have been optimized to increase ventilation and thereby comfort.

Pipes placed under the playing surface gather heat in the winter to warm the stadium and coldness in the summer to cool the stadium. The stadium’s design originally called for a capacity of 100,000 people; however 9,000 were removed during a simplification of the design, which gave a total of 91,000 seats during the Olympic Games. Today the seated capacity is reduced to 80,000.

FlowCon SM valves, which are pressure independent dynamic flow and temperature control valves, were installed on the Air Handling Units of the VIP gallery. The use of the most advanced control valves in the world was used to ensure the optimum control of air temperature in the gallery.

Project Configurations

Type of Application: AHU
Project Name: National Stadium, Beijing, China
Type of Building: Stadium
Capacity: 80.000
Developer: Chinese Government
Date Opened: June 28th 2008
Date Installed with SM valves: Approximately December 2007
Architect: Herzog & De Meuron, Arupsport; China Architectural Design & Research Group
Structural Engineer: Arup

More Information


Latest FlowCon Projects

See all projects

Cooling - Air handling units - FlowCon Green - FlowCon SM

New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…

Cooling - Heating - FlowCon E-JUST - Griswold Quickset

The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…

Cooling - Air handling units - Pre-Cool Air Handling Units - Fan Coil Units - FlowCon Green - FlowCon SM

800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves

FlowCon Project at Cactus Towers Copenhagen Denmark
Heating - Radiators - Underfloor Heating - FlowCon GreEQ - FlowCon SDP

"Micro-living" youth housing in the heart of Copenhagen. Efficient and sustainable - this goes for building design and the choice of FlowCon valves

FlowCon Project at High Garden Bagneux
Heating - Fan Coil Units - Radiators - FlowCon ADP - FlowCon EDP - FlowCon Green - France

The new complex will include 250 apartments and a French-style convenience store – with FlowCon PICV and DPCV

FlowCon Project at Oval Village London outside
Heating - Cooling - Fan Coil Units - FlowCon By-Pass Mini - FlowCon Green - FlowCon GreEQ - London - United Kingdom

Modern homes with focus on indoor climate and reduced energy consumption – installed with FCU bypass units including FlowCon PICVs