06.2018

New facilities of Sheremetyevo Airport, Russia
- for 2018 FIFA World Cup

Opening of the new Terminal B in Moscow Sheremetyevo Airport is part of the preparations for this summer’s 2018 FIFA World Cup. Expansions were needed to service the high number of players, fans, officials and journalists – staying cool by FlowCon.

With these first steps, Sheremetyevo – Russia’s busiest airport – expects in the long run to enter the top ten quality servicing airports in the world.

The new Terminal B has the floor area of 110.525 m2 and a yearly capacity of up to 20 million passengers (4.200 passengers per hour). Its new automated baggage processing system is integrated with the other terminals with the total throughput of 4.800 pieces of baggage per hour. Additional plans for the airport include reconstruction of the currently inoperable Terminal C and integrating it with the new Terminal B in 2019. This will further increase the airport’s capacity. In 2026, according to plans, the capacity of the entire airport will reach 80 million passengers.

During the FIFA World Cup, which takes place in Russia between 14th June and 15th July 2018, special “fun zones” broadcasting the matches will be in place in Terminal B.

Already now the new Terminal B is the home of Aeroflot and will continue to service travelers to and from Moscow in the years to come.

Project Configurations

Architect: RMJM Serbia
Consultant: Goltsblat BLP
Contractor: OOO Sheremetyevo Terminal B
(a joint venture between MASH OAO and TPS Avia Holding Ltd)
Project Name: Terminal B at Sheremetyevo International Airport, Khimki, Moscow, Russia
Configuration of Building: Terminal building incl. inter-terminal underground passage, retail zone and food court, four lounges + 4-storey parking
Number of Valves: +2000 valves
Valve Model: Chillers: FlowCon Wafers
FCUs: FlowCon AB w. E-JUST
Convectors: FlowCon Green
Configuration: PICVs on Convectors and ABVs on Chillers and FCUs
Types of Application: New building
Date of Installation: 2017
Date of Inauguration: 3rd May 2018

More Information


Latest FlowCon Projects

See all projects

Cooling - FlowCon PICV - Fan Coil Units - FlowCon Green

IT specialists gathered under one roof and FlowCon helps to provide optimal working environment with FlowCon Green PICVs

Cooling - FlowCon PICV - Fan Coil Units - FlowCon Green

Vardanants offers high-quality medical services for all

Cooling - Air handling units - FlowCon Green - FlowCon SM

New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…

Cooling - Heating - FlowCon E-JUST - Griswold Quickset

The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…

Cooling - Fan Coil Units - FlowCon E-JUST

From static to dynamic balancing – from internal to external adjustability – easy exchange with FlowCon ABVs

Cooling - Air handling units - Pre-Cool Air Handling Units - Fan Coil Units - FlowCon Green - FlowCon SM

800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves