A distinct wave shape characterizes the new terminal, T4. With the project’s particular focus on user comfort, system flexibility and energy efficiency, FlowCon was the right choice.
Just west of the Xiaoshan urban district in the regional city of Hangzhou, the Hangzhou Xiaoshan International Airport is located. With the completion of the 3rd phase the airport includes a brand-new terminal building T4, a large transportation center and several new hotels. With the extension the airport will now be able to handle a passenger increase from 30 million to up to 90 million per year. This consolidates the airport’s position in the top ten of biggest airports in China. The airport is ready for the coming Asian Games later in 2022 hosted in Hangzhou.
T4 design was limited to a dictated area of maximum 1000 meters in length and maximum 200 meters in depth. Despite the strict boarders, the new terminal building is huge (4 floors totaling 720.000 m2) and is recognizable and welcoming with its ‘wave’ design. T4 is double in size compared with T1, T2 and T3 together. To accommodate nature and light, T4 includes four green areas with large skylights and filled with local trees. These green zones are providing moments of light and serenity in an otherwise busy travel environment.
Application
FlowCon has supplied all PICVs and DPCVs and Temperature Control Valves to the terminal building used on FCUs and AHUs. One of the reasons for choosing the FlowCon products is the unique SM-actuators on the flanged PICVs. Here you can configure the valve and read valve performance directly on the actuator, a function which made hydraulic commissioning easy, despite the physical size of the HVAC system. Using FlowCon valves also allow for straightforward system expansion or modification if required in the future. And with the use of pressure independent valve solutions at the coils and controlled pressure distribution between system zones, running costs are kept at a minimum. The customer’s realization of the lower total cost of ownership when using FlowCon solutions, made the choice straightforward.
Project Configurations
Project name: | Hangzhou Xiaoshan International Airport |
Client: | HIA, Hangzhou International Airport |
Architect: | Powerhouse Company, Benthem Crouwel Architects and East China Architectural Design & Research Institute, ECADI |
Contractor: | China Construction 3rd Engineering Bureau Group |
Valve model and quantity: |
PICVs: FlowCon Green and FlowCon SM DPCVs: FlowCon EDP and FlowCon FYC Temperature Control: FlowCon EVS Static Balancing: FlowCon FSB and FlowCon DRJT Totaling ~1000 valves |
Application: | New building |
Date of inauguration: | 12.2021 |
More Information
Latest FlowCon Projects
See all projects
New office for Yandex, Armenia
IT specialists gathered under one roof and FlowCon helps to provide optimal working environment with FlowCon Green PICVs
Expansion of Medial Center in Yerevan, Armenia
Vardanants offers high-quality medical services for all
Umm al Seneem Park, Doha, Qatar
New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…
Netflix Film and Series production on new Sound Stages in New Mexico, USA
The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…
Upgraded HVAC system at the Radisson Blu Hotel, Yerevan, Armenia
From static to dynamic balancing – from internal to external adjustability – easy exchange with FlowCon ABVs
World’s largest Duty-Free Mall on Hainan Island, China
800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves