PRIME PARK is a world-class residential complex just 10 minutes away from Moscow city center and the Moscow Kremlin, but it is so much, much more than any other apartment project …
As part of a new urban quarter of City of Moscow and with its location on Leningradsky Prospect between Moscow city center and Sheremetyevo Airport, PRIME PARK is uniquely placed with easy access to both the Russian capital and the world. The project includes 9 towers covering a ground area of 2.800 m2 for the residential area, 1.500 m2 green areas and has four metro stations available within walking distance.
The building area covers 377.000 m2 and apartment sizes range from 1-bedroom over multiple bedrooms to duplex and penthouse. Each apartment is presented based on 80 different options of decoration and at least 3.1-meter ceiling height. This results in airy, spacious and at the same time individual solutions.
The PRIME PARK project includes a central lobby, fitness club and swimming pool, underground parking, and plenty of green zones. For families with children PRIME PARK also includes a school, two daycare centers, and playgrounds totaling 18.000 m2 educational facilities. And for the busy family a grocery store, a pharmacy, a dry cleaner, numerous restaurants and cafes are directly at hand as well as beauty parlor, dance studio and décor boutique - in total 12.000 m2.
This gigantic project is the winner in five nominations under ‘Best European Project 2018/19’.
Application
FlowCon has supplied to the original project and now that the project is being extended with yet another tower, we will obviously be the preferred supplier of PICVs, DPCVs, Automatic Balancing and Thermostatic valves. We are proud to be selected again and again.
Project Configurations
Project name: | PRIME PARK |
Developer: | Optima Development |
Architect: | Group DYER |
Contractor: | DLG CONTRUCTION |
Valve model and quantity: |
Pressure independent control: FlowCon UniQ® with thermal ON/OFF control Dynamic balancing: FlowCon E-JUST and FlowCon Wafer Differential pressure control: FlowCon EDP Thermostatic balancing: FlowCon T-JUST All together 17.500+ valves |
Application: | New building |
FlowCon distributor: | Yakrus |
Date of inauguration: | Original project 2019 - New tower 2021 |
More Information
Latest FlowCon Projects
See all projects
New office for Yandex, Armenia
IT specialists gathered under one roof and FlowCon helps to provide optimal working environment with FlowCon Green PICVs
Expansion of Medial Center in Yerevan, Armenia
Vardanants offers high-quality medical services for all
Umm al Seneem Park, Doha, Qatar
New recreational facilities including opening of the world's longest air-conditioned outdoor walking track open the possibility of a healthier…
Netflix Film and Series production on new Sound Stages in New Mexico, USA
The sound stages will secure creating and capturing of sound in high quality. And FlowCon and Griswold HVAC valves will secure the correct indoor…
Upgraded HVAC system at the Radisson Blu Hotel, Yerevan, Armenia
From static to dynamic balancing – from internal to external adjustability – easy exchange with FlowCon ABVs
World’s largest Duty-Free Mall on Hainan Island, China
800 well-known international and domestic brands under one roof, and indoor climate is controlled by FlowCon valves