FlowCon FN Actuators

FlowCon FN
for FlowCon Green

  • For FlowCon Green.0, Green.1, Green.1HF, Green.2
  • Electrical actuators, 24V, 110V or 230V
  • 0(2)-10V modulating, 3-point floating or 2-position
  • Standard with feedback on modulating versions
  • Standard with override on modulating versions
  • Settable control characteristics (linear control or equal percentage control) on modulating versions
  • Settable control direction (NO/NC)
  • Optional bus, BACnet or Modbus
  • Auto cycle available on modulating versions
  • Position indicator
  • IP54, 360°
     

FlowCon FN
for FlowCon GreEQ

  • For FlowCon GreEQ.0, GreEQ.1, GreEQ.2
  • Electrical actuators, 24V
  • 0-100% control, BACnet or Modbus
  • 0-100% feedback, BACnet or Modbus
  • Standard with override
  • Linear control characteristics
  • Auto cycle available
  • Position indicator
  • IP54, 360°
     

FlowCon FN
for FlowCon FIT-G

  • For FlowCon FIT-G DN15-40 (1/2"-1 1/2")
  • Electrical actuators, 24V
  • 2-10V modulating input
  • 2-10V feedback
  • Standard with override
  • Linear control characteristics
  • Settable control direction (NO/NC)
  • Auto cycle available on modulating versions
  • Position indicator
  • IP54, 360°
     

FlowCon FN
for FlowCon Essentia

  • For FlowCon Green.0, Green.1, Green.1HF, Green.2
  • Electrical actuators, 24V, 110V or 230V
  • 0(2)-10V modulating, 3-point floating or 2-position
  • Standard with feedback on modulating versions
  • Standard with override on modulating versions
  • Settable control characteristics (linear control or equal percentage control) on modulating versions
  • Settable control direction (NO/NC)
  • Auto cycle available on modulating versions
  • Position indicator
  • IP54, 360°

Questions?
Then Give Us a Call

If You have any questions, either in regard to FlowCon's products and services or how and where to use FlowCon products, just get in touch and we will be pleased to assist.

We will react as soon as possible, and written reply is normally within 8 hours if Your question is asked in English and during office hours. Other languages and requests asked during vacation time or weekends may experience longer response time. Likewise, for any special – out of standard – requests, You may not see an immediate reply, but we are responsive.

Contact us here →


Latest News

See all

EPD - HVAC - PICV - FlowCon Green - FlowCon SM

The EPDs cover the FlowCon Green and FlowCon SM ranges. Further EPDs in pipeline....

 

CUC Engineering - Technical Composite - Box Build - Cable Solution - FlowCon Group

A strategic step for FlowCon – cables, box builds and technical composites

 

BIM Library - HVAC

With our aim to make the calculation and selection process as simple and user-friendly as possible, we now launch our own complete BIM library...